Kitchen Renovation
Your kitchen is the hardest-working room in your home — and the most expensive to get wrong. Rocky Point Projects is a Red Seal certified renovation contractor based in Port Moody, serving Metro Vancouver and the Sea-to-Sky corridor. We design and build kitchens that fit how you actually cook, gather, and live — with one accountable crew from first sketch to final walkthrough.
Get a Free QuoteWhy Us
Red Seal is Canada's highest trade standard. Your kitchen is built by certified professionals, not whoever happened to show up that week.
We work across Heritage Mountain, Heritage Woods, Glenayre, College Park, Inlet Centre, Suter Brook, and the rest of the Tri-Cities — so site visits, supplier runs, and quick decisions never wait on a contractor stuck on the highway.
From 1960s–70s Glenayre and College Park homes with dated layouts and older wiring, to the newer Heritage Woods builds that deserve a kitchen to match the view — we've seen what's behind those walls, and we plan for it.
When your project needs City of Port Moody permits — electrical, plumbing, gas, or layout changes — we manage the applications and inspections so you don't have to.
Cabinetry, countertops, plumbing, electrical, lighting, tile, and finishes coordinated under a single plan and a single point of contact. No chasing three different trades.
What's Included
By Home Type
1960s–70s homes
Opening up walls to create flow between the kitchen and living areas, updating decades-old electrical and plumbing while we have access, and adding storage the original builders never planned for.
Finishing-level upgrades
Statement islands, integrated appliances, quality millwork, and lighting that matches the rest of these well-built homes.
Inlet Centre, Suter Brook, Klahanie
Smart space planning, strata-compliant scheduling and rules, and renovating without disturbing the whole building.
Pricing
Port Moody kitchen renovations typically fall in these ranges:
Refresh
New countertops, hardware, paint, lighting
Mid-range renovation
New cabinetry, layout mostly unchanged
Full renovation
Layout changes, custom cabinetry, updated services
The biggest drivers are cabinetry selection and whether you move plumbing or walls.
FAQ
Most mid-range kitchen renovations take 4–8 weeks of on-site work. Design, material ordering, and permitting happen before that — we'll give you a realistic timeline with your quote, not a best-case guess.
Whether it's a full transformation or a well-planned refresh, Rocky Point Projects brings Red Seal craftsmanship and honest advice to every kitchen we build in Port Moody and beyond.
Get Your Free Quote