Planning a renovation in Port Moody, Coquitlam, Burnaby, or anywhere in Metro Vancouver? This cost guide breaks down realistic price ranges for every major renovation type in the current BC market. All figures are based on actual project data from Rocky Point Projects — a Red Seal certified renovation contractor based in Port Moody — and reflect 2025–2026 material and labour costs in the Greater Vancouver area.
🔧
Kitchen Renovation
Timeline:4–8 weeks
A mid-range kitchen renovation in Metro Vancouver typically includes semi-custom cabinetry, stone countertops, new appliances, tile backsplash, and updated lighting. High-end builds with custom millwork, premium appliances, and structural layout changes push past $100,000.
Cost Factors
- •Cabinetry quality (stock vs semi-custom vs full custom)
- •Countertop material (laminate, quartz, marble, porcelain)
- •Appliance package
- •Plumbing and electrical relocation
- •Structural wall removal
- •Permit requirements
🛁
Bathroom Renovation
Timeline:2–4 weeks
A standard bathroom renovation includes a custom tile shower, new vanity, toilet, lighting, and flooring. Luxury bathrooms with heated floors, freestanding tubs, custom glass, and premium tile typically range from $35,000 to $70,000.
Cost Factors
- •Tile selection (ceramic vs porcelain vs natural stone)
- •Custom glass shower enclosure
- •Heated floor systems
- •Plumbing relocation
- •Vanity and countertop material
- •Waterproofing and membrane systems
🏠
Full Home Renovation
Timeline:8–20 weeks
Full home renovations vary dramatically based on square footage, scope, and finish level. A typical 1,500–2,500 sq ft home in Port Moody or Coquitlam ranges from $150–$300 per square foot for a comprehensive renovation including kitchen, bathrooms, flooring, paint, and mechanical updates.
Cost Factors
- •Square footage
- •Number of bathrooms and kitchen scope
- •Mechanical upgrades (electrical panel, HVAC, plumbing)
- •Flooring selection
- •Permit and inspection requirements
- •Asbestos or lead remediation in older homes
🪚
Custom Carpentry & Millwork
Timeline:1–4 weeks
Custom built-ins, shelving, wainscoting, coffered ceilings, and feature walls are priced per project. A single feature wall or built-in entertainment center typically starts around $5,000, while whole-home trim packages and millwork can exceed $50,000.
Cost Factors
- •Wood species and finish
- •Complexity of joinery
- •Built-in vs freestanding
- •Paint grade vs stain grade
- •Hardware selection
- •Site conditions and access
🏢
Commercial Buildout
Timeline:4–16 weeks
Commercial renovations are priced per square foot and depend heavily on the intended use. Retail fit-outs range from $75–$200/sq ft, restaurant builds from $150–$350/sq ft due to kitchen equipment and ventilation, and office renovations from $50–$150/sq ft.
Cost Factors
- •Type of business (retail, office, restaurant, medical)
- •HVAC and ventilation requirements
- •Plumbing and grease traps (restaurants)
- •Accessibility compliance (BC Building Code)
- •Tenant improvement allowances
- •After-hours work requirements
🏘️
Strata & Multi-Unit
Timeline:2–8 weeks
Strata renovation costs depend on whether the work is interior (owner responsibility) or common property (strata responsibility). Individual unit renovations follow residential pricing. Common property projects like deck replacement, siding, or roof repairs are quoted per project with strata council approval.
Cost Factors
- •Strata bylaw requirements
- •Common property vs limited common property
- •Noise and work-hour restrictions
- •Insurance and bonding requirements
- •Strata council approval timeline
- •Coordination with property manager
Additional Costs to Budget For
Beyond the core renovation costs above, these are the common additional expenses that Metro Vancouver homeowners should factor into their total budget. Many of these are required by BC building code or local municipality regulations.
Building permit (Port Moody)
Based on project value; City of Port Moody Development Services
Building permit (Coquitlam)
Based on project value; City of Coquitlam Building Department
Required for structural changes, load-bearing wall removal
Asbestos assessment & remediation
Required for homes built before 1990 per BC regulations
Common in homes built before 1980 with 100-amp or knob-and-tube
Depends on number of fixtures and relocation distance
Includes bin rental, labour, and dump fees
Interior walls, ceilings, trim; depends on square footage
Get an Accurate Fixed-Price Quote
These ranges are a starting point. The only way to know exactly what your renovation will cost is an in-home consultation where we assess existing conditions — plumbing locations, load-bearing walls, electrical panel capacity, and material selections. We provide a written fixed-price quote with no hidden costs.